Yorkshire Air Museum is to be the new home for Avro Shackleton WR693, currently at Coventry Airport. Volunteer Engineer Graham Buckle brings us up to date on the painstaking work to dismantle this fantastic machine, ahead of it moving north (in pieces) for reassembly at Elvington (all images courtesy of Graham Buckle.)
The Shackleton dismantling process continues. Recently a YAM “Away Team” of myself, Tricia Room, John Best, Carolyn and Marcus Cordran, and Nimrod team electrical wizard Fletch headed south to join in with the resident Shack team for a cold January working weekend to get our hands dirty on ‘63.
The plan was to get the last two engines and hopefully the starboard tailfin disconnected and lifted off the aircraft, and anything else we could manage, such as continuing the war on the wing joint access panels. On the first day we had all the engine services disconnected, John had got the fin bolts all moving after a protracted battle, the aerials were down and stowed and the starboard inner engine nacelle had been dismantled enough to give good access to the wing main spar bolts. They look like such fun.

Day 2, and we were on site bright and early as was the Foden crane which would be doing the day’s heavy lifting. I say heavy lifting, Mark the owner of the truck said he’d replaced a couple of the hydraulic pipes on the crane during the week and decided he’d best test them, so he just lifted his Chieftain tank with it! So I don’t think our engines qualify as heavy by comparison, and at around 300lbs the fin and rudder assembly certainly doesn’t!

With the crane set up, we removed ‘63’s starboard fin first, a significant step for us as this is the first major airframe assembly to be removed from the aircraft during the dismantling process. The crane then moved round to the front of the aircraft and positioned itself to lift the port engines off the aircraft.
Much swearing at tapered engine bearing pins later, and the port engines were away by mid afternoon, leaving us with a 120ft wingspan glider! Sadly, many Jaffa Cakes and sweeties were harmed in the process. After a tidy round, we left the aircraft with one fin off, all four engines off, most of the starboard inner nacelle off, and inroads made into the stacks of wiring which must be meticulously annotated and then carefully disconnected in order to bring 63 back to life again in her new home.

The next “big weekend” should hopefully involve the removal of the outer wing sections; watch this space.
Thanks to the kindness of Lincolnshire Aviation Heritage Centre and Mike Davey for lending us a full set of Merlin/Griffon engine transport/storage stands between them, which means the engines can make their way to us very soon.
Also, thanks to David Bayliss at Luddite Engineering, for hauling the Shack MR.1/T.4 nose section to YAM before Christmas, the fourth engine stand to Coventry from Mike’s base in the deep dark North-West, and for fabricating various tools and the engine stand adaptors for us.

The Starboard fin being off the aircraft, and as long as this week’s storms haven’t blown it away there’s no reason it also can’t imminently head our way. Exciting times, as the arrival of major parts of ‘63 on site at YAM becomes imminent! All the lifting off of heavy stuff was done by Mark and James Worrall with their fantastic ex-army Foden crane and they will continue to work with us on the dismantle, huge thanks to them for their time and skill.